Hebei Cangrun Pipeline Equipment Co.,Ltd specialized in pipe fittings, flanges and nipples. Our company has strong technical force. With complete production equipment, it has more than 120 sets of production equipment, including 8000 tons of four column press, 1600 tons of pushing machine, 800 tons of large pipe bending machine and 8 tons of forging hammer.
It can produce valves, flanges, elbows, tees, crosses, reducers, pipe caps, sockets and other pipe fittings and extension products of all specifications of carbon steel, alloy steel, stainless steel, pipeline steel, low-temperature steel and other materials according to domestic and international and industrial standards. We adhere to quality first, customer first, as our purpose.
| Product | Pipe Fitting Tee | |
| OD | 1/2"-72" DN6-DN1200 | |
| Wall thickness | Sch5-Sch160, xxs | |
| Standard | ASME / ANSI / DIN / GB / EN / SH / GD | |
| Material | Carbon steel | 10#, 15#, 20#, 30#, 45#, Q195, Q235, Q345, 16Mn, GRADE: A/B/C/D A234 WPB, A106 B, A516-55, A333 Gr6, A182 SA105, 1010, 1012, 1025-1060, 045M10, 095M10, 050A200, 60A30, 060A35 S10C, S15C, S20C, S25C, S30C, S35C, S40C, S45C, XC10, XC12, XC18, XC32, XC38TS, XC38H1 |
| Alloy steel | A234 WP11, WP12, WP22, WP5, WP9, 12Cr1MoV, 1Cr5Mo, 15CrMo, 10CrMo910, SA335 P11, P12, P22, P5, P9, A213 T11, T12, T22, T5, T9, A182 F22, A182 F9, A182 F5, SCM415, SCM21, 16CrMo44(1.7337), A387 Cr.B, 15XM, 12CD4, 10CrMo910, STPA25, 12CrMo194 | |
| Stainless steel | 0Cr18Ni10Ti, 0Cr18Ni9, 302, S30200, 303, S30300, 304, S30400, 304L, 321, S32100 and so on | |
| Packaging | Seaworthy Package, Plywood Wooden Cases or wooden pallet or as per customer's requirement | |
| Applications range | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc. | |
| Min Order Quantity | According to customer's requirement | |
| Delivery Time | According to quantity, normally 30 days | |
| Quality | Top | |
| Productivity | 50,000 Tons per year | |
| Key to Success | Advanced technique and service | |
| Authentication | ISO 9001:2000, ISO14001 | |
MOQ is one piece. We can offer samples for free, while the customer only pays for the transport charge.
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please discuss your requirements with your sales representative. In all cases, we try our best to accommodate your needs.
You can make the payment to our bank account, Western Union, or PayPal: 30% deposit in advance, and 70% balance against the copy of B/L.
As usual, products are packaged with wooden pallets or plywood wooden cases. We can also custom pack the products according to customer requirements.
Our company is certified with ISO 9001:2000 and ISO14001. All products can be manufactured strictly following ASME, ANSI, DIN, GB, EN, SH, and GD international standards.
With over 120 sets of advanced production equipment, our factory has an annual productivity of up to 50,000 Tons per year.